The long awaited Comptroller and Auditor General (CAG) report on the Rs 59,000 crore Rafale deal tabled on the last day of the Parliament has indicated that the deal for the aircraft inked by the NDA government is 2.86 per cent cheaper for 36 fighters compared to the deal which was being negotiated by the UPA government for 126 aircraft.

While the report has not specially mentioned individual price for each fighter, it does however has examination of the pricing. The prices have been redacted in the audit report based on the insistence of the Defence Ministry citing the Indo-French agreement of 2008 and the provisions of Inter-Government Agreement (IGA).

The report on “Capital Acquisition on Indian Air Force” stated, “Overall, it may be seen that as against the Aligned Price as estimated by Audit of ‘CV’ million Euro, the contract was concluded for ‘U’ million Euro i.e. 2.86 per cent lower than the Audit Aligned Price.”

Audit findings relating to the acquisition of Medium Multi Role Combat Aircraft through an IGA with the government of France is part of the report and “this includes examination of the pricing.”

On the removal of the banking and performance guarantees: the report states that the winning companies have to give these in standard commercial contracts and has not been included and that the benefits of these would be accrued by the French Company Dassault Aviation.

Terms set for Faster Delivery: Government gets little credit for cutting down the delivery time just by a month though this was being bought for the urgent requirement of the Indian Air Force (IAF).

Outlining the methodology of the price comparison: It points out the price offered by M/S Dassault Aviation in April 2008 against the Request for Proposal (RFP) of 2007 was a market discovered price and based on competitive bidding.

The basic price of the aircraft was similar in both the deals being negotiated.

India will have to go into arbitration with the French vendors if any trouble comes its way in terms of deliveries or quality of work

Since this is government to government deal the French government will only ensure that the vendors pay up if the Indian side wins these arbitration proceedings.

Earlier safeguards proposed that the vendors banking guarantees can be encashed if any violations are found.

Today’s report has not studied the Offsets. They will be submitted to the government by the French company only later this year.

The price offer of 2007 had two distinct packages: pricing for 18 flyaway aircraft package and pricing for Transfer of Technology (ToT) package for 108 aircraft which were to be produced in India under license.

Package for 18 flyaway aircraft (one squadron) was somewhat possible if constrained by factors and therefore the Indian Negotiating Team (INT) compared this packages with their corresponding prices in the 2015 price bid for 36 flyaway aircraft (two squadron).

“The acquisition and price bids of 2007 and 2015 were very different as the latter included the price of ToT for license production of 108 aircraft in India which was 77.8 per cent of the total price bid of 2007, “said the report.

According to the report the INT therefore aligned the quantities in the 2015 bid with that in the 2007 bid and then the price of 2007 was brought to 2015 price level by applying the price escalation formula which used the industrial cost indices published by the French National Institute of Statistics and Economic Studies (INSEE).

This was the Aligned Price i.e. the price of 36 flyaway aircraft in 2015 if the prices of the same as the bid of 2007. Audit also used the same methodology and verified the price comparison made by the INT.

Comparing 2007 with 2015 price bids, the CAG said: “The Aligned Price worked out by INT was ‘U1’ million Euro while the Aligned Price as assessed by the audit was ‘CV’ million Euro which was about 1.23 per cent lower than the INT aligned cost.”  This was the price at which the 2015 contract should have been signed if the prices of 2007 and 2015 were considered at par. But as against this, the contract was signed in 2016 for ‘U’ million Euro which was 2.86 per cent lower than the Audit’s aligned price.

The difference between the Aligned Price estimated by INT and of Audit could be attributed to inconsistent price variation factors adopted by INT, alignment of the quantities/scope of the two offers and the difficulties of the alignment itself, the report added.

The specifics of Indian Specified Enhancements: It has aligned the scope of offer of 2007 and contract of 2016. “The 2007 offer included Missiles ‘A1’ which was excluded by IAF in 2015 because it was being developed indigenously by Defence Research and Development Organisation (DRDO).

“In place of Missiles ‘A1’ IAF included Missiles ‘A2’ for integration on the aircraft. The difference between integration of Missile ‘A1’ and Missile ‘A2’ which was ‘IS3’ million Euro had to be deducted from the ISE price of ‘XX’ Million Euro. This works out to ‘AX1’ Million Euro. Therefore, the aligned price by Audit was estimated to be ‘AX2’ Million Euro. As against this, the contract was signed for ‘AX3’ Million Euro, a saving of 17.08 per cent,” the report said.

Item-wise analysis of prices showed that the contracted prices of seven items were higher than the aligned price, three were same and four were lower. Also the price of elements could not be compared because the structure/format of Dassault bid of 2007 and offer of 2015 were different, it said.

On the Engineering Support Package, the report said there is an excess of 6.5 per cent over the Audit aligned price. On Performance Based Logistics, there is an excess of 6.54 per cent over the Audit aligned price, for Operational Support, equipment and other technical assistance, CAG found that against the Aligned price of ‘ST7’ Million Euro, the contract was signed ‘ST8’ Million Euro with a savings of ‘ST13’ Million Euro.

On Simulator Package, the Audit aligned price is ‘SP3’ Million Euro, which is the same as the INT aligned price; Weapon Package — after alignment of scope of the aligned price worked out to ‘WP1’ Million Euro and the contract price was ‘WP2’ Million Euro, a saving of 1.05 per cent.

The Ministry of Defence has pointed out that the aligned price worked out by INT and Audit in the case of basic aircraft was the same and has argued that the negotiated price of 36 flyaway aircraft was 9 per cent lesser than the price offered for the aircraft in 2007.

However, the CAG said: “There is no difference between the bid of 2007 as escalated by INT with actual escalation factors, and the negotiated cost of the 2015 offer, for the same aircraft.”