AMN /
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Narendra Modi has given its approval for doubling of Kiul-Gaya Railway line of 124 km with a completion cost of Rs.1354.22 crore.
Doubling of this line will greatly ease the ever increasing freight traffic between these sections. The project is likely to be completed by 2019-20.
Lakhisarai, Sheikhpura, Nawadah and Gaya districts of Bihar will be benefited through this project.
The Kiul-Gaya section falls in Danapur Division of East Central Railway. At present traffic utilization of the section is 135.5%. Since the existing section capacity is almost fully utilized and to cater to the continuously increasing freight traffic, the work of Kiul-Gaya doubling project is essentially required. The project will serve the freight traffic for Super Thermal Power Plant at Barh which is likely to be completed shortly. Daily requirement of Coal for this plant will be 18 rakes of coal and 14 pairs of goods trains are likely to move on this section. Average number of trains handled on the section per day is 13 trains each way. This includes 11 pairs of Passenger Trains and 2 pairs of goods trains. Five pairs of Mail/Express is expected to be augmented after commissioning of the Koderma-Tilayia section.